Progress at the house is as follows, wood flooring is finished, counter top is installed, kitchen sink in, lighting through out is up, painting finished, transition pieces are in, and tile flooring is being installed. The picture below shows the back entry. Since that picture was taken, the transition between the wood and tile was placed, tile has been installed into the laundry/half bath, and tile has been grouted. We're not finished laying tile in the laundry (ran out) so that's on the list of things to do this week. We will be putting in a laundry tub sink and moving the washer and dryer back into that room. THEN the carpeting can be installed in the living room and one bedroom and we'll be FINISHED!! The end is so near! There will be several things we continue to do (as it is with owning a home) but I cannot wait to be done with construction and focus on life!
Things with Baby P #2 are going well. Feeling great!
Okay, better take advantage of this day and get some things done! Enjoy the new pics!
Back entry with tile being installed
Our little Ham!!
Daddy and Dietrich